NETWORK DIAGRAM

Redundant Campus Triangle Core with Dual Uplinks

A worked network diagram example, rendered live. Open it in the AI editor and adapt it to your own case.

UPDATED 2026-09-21
EXAMPLERedundant Campus Triangle Core with Dual Uplinks
Make this diagram your own.

Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.

CASE ANALYSIS

Scenario

A campus core requires high availability through three routers arranged in a full-mesh triangle, each with dual uplinks to distribution layer switches to eliminate single points of failure.

Key decisions

  • Connect the three core routers pairwise with LAG links to form a resilient triangle core.
  • Provide dual fiber uplinks from each core router to both distribution switches for redundant paths.
  • Use 20G LAG inter-core links and 10G fiber uplinks for scalable bandwidth.

When to reuse this

Use this pattern when documenting or designing a redundant campus core where any core router or core link can fail without isolating the distribution layer.

Open this example in the editor →

Tweak it with chat, export PNG/SVG, or fork it for your own use case.