Clinical study start-up three-point PERT

This three-point PERT chart estimates clinical study start-up while exposing uncertainty in regulatory review and site activation. A draft protocol begins ethics review and site selection. Selected sites are contracted, then training waits for both the ethics decision and signed site contracts. Enrollment opens only after training. Optimistic, likely and pessimistic durations give the team a way to plan around review timing and contract variability without treating them as fixed. Extend the network with budget approval, investigator meetings, data-system validation or drug supply release when those steps affect study activation.

Tipo PERT / GanttNorma PMI PMBOK 7 + Moder 1983 (AON/PDM)Motor schematex-pertActualizado 24/9/2026
Clinical start-up PERT estimate
Drawing preview
La solicitud

“Create a three-point PERT estimate for clinical study start-up: draft protocol, complete ethics review, select sites, contract sites, train sites, then open enrollment.”

Entonces pruebaAdd a data-system validation before enrollment.Change the likely ethics review duration to fourteen days.
Qué hay en este dibujo

Lee las decisiones que hay detrás.

01Protocol gate

Ethics and site selection begin after the draft.

02Site gate

Contracting follows selection.

03Activation gate

Training needs ethics approval and contracts.

Use for an early clinical study plan.

Explorar todas las plantillas de PERT / Gantt →

Preguntas frecuentes

Preguntas habituales

Why use three-point estimates?

Review and contracting durations are uncertain.

What blocks training?

Ethics review and site contracts.

When does enrollment open?

After site training.