A G99 connection application for a grid-tied solar PV system with export limitation to zero, using a Fronius Symo 8.2kW inverter with dual MPPT.
Qué hay en este dibujo
Lee las decisiones que hay detrás.
01
Export limitation set to zero
02
Main switch and protection sizing
03
Metering point location
For UK installers submitting G99 applications for small-scale solar PV systems with grid export restrictions.