MINING
Surface Copper Mine 15 kV Electrical Distribution
A worked mining example, rendered live. Open it in the AI editor and adapt it to your own case.
Make this diagram your own.
Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.
CASE ANALYSIS
Scenario
A surface copper mine requires a 15 kV distribution system to power large electric shovels and drills.
Key decisions
- 115 kV grid connection stepped down to 15 kV via a 20 MVA transformer.
- 15 kV main switchgear distributes power to multiple feeders.
- Each large load (shovels, drills) is fed via dedicated circuit breakers with ground fault protection.
When to reuse this
Used for planning and documenting mine power distribution systems, ensuring proper protection and load distribution for high-power mining equipment.