El escenario
A university library requires reliable power for both normal operations (HVAC, general lighting) and critical functions (servers, emergency lighting, elevators) with backup via a generator.
Qué hay en este dibujo
Lee las decisiones que hay detrás.
01
Separation of normal and critical loads via independent buses after the main switchboard.
02
500 kW generator sized for essential loads only, with ATS transfer.
03
Critical bus supplies servers and life safety loads, normal bus supplies general building services.
Suitable for any campus building needing a clean separation between essential backup and non-essential loads in a single-line electrical design.