ChatDiagram
Petroleum Engineering · Reservoir Simulation · History Matching

Reservoir Simulation History Matching and Calibration Workflow

Type FlowchartStandard Sugiyama layered DAG + orthogonal routingEngine schematex-flowchartUpdated 9/9/2026
Reservoir Simulation History Matching and Calibration Workflow
Drawing preview
The scenario

A reservoir engineering team must calibrate a simulation model to historical production and pressure data before using it for forecasts. The workflow loops through sensitivity analysis and assisted history matching until both history match and blind validation are acceptable.

What is in this drawing

Read the decisions behind it.

01

Whether data quality passes before model preparation

02

Whether the history match is acceptable

03

Whether blind validation is acceptable

Use this flowchart for any reservoir simulation study requiring model calibration, including greenfield development planning, brownfield optimization, and reserves estimation.

More like this

Other examples in this family.

Browse all flowchart templates →