The scenario
A manufacturing quality manager needs to design an inspection routine that prioritizes high-risk, high-frequency checks and ensures no critical items are overlooked.
What is in this drawing
Read the decisions behind it.
01
Classify each inspection item by frequency and severity of potential defect.
02
Focus daily resources on Q2 (high frequency, high impact) tasks to catch critical defects early.
Use this matrix when establishing a new quality control program or auditing an existing one to balance inspection efforts and reduce risk.
More like this