The scenario
Design a P&ID for an automotive coolant test loop used to validate EV battery thermal management, including chiller cooling and dual pump redundancy.
What is in this drawing
Read the decisions behind it.
01
Use dual centrifugal pumps in parallel with check valves to prevent backflow.
02
Place a motor-actuated flow control valve after the chiller to regulate coolant flow to the battery heat load.
03
Return coolant to the expansion tank to close the loop.
Applicable for EV battery thermal testing rigs, coolant loop validation, and industrial cooling systems with redundant pumping.
More like this