The scenario

An industrial campus operates a hybrid microgrid with a 2 MW gas combined heat and power unit, 1 MW solar PV array, and 1 MW/2 MWh battery energy storage system, all connected to a 13.8 kV bus and supplying campus loads via a step-down transformer, with metering and breaker protection.

What is in this drawing

Read the decisions behind it.

01

Selecting 13.8 kV for the main collection bus and 480V for DER and load connections

02

Representing the BESS as a UPS node with bidirectional capability

03

Adding step-up transformers for low-voltage PV and BESS to match the 13.8 kV bus

04

Using dedicated circuit breakers for each source and load feeder for isolation and protection

05

Including a watthour meter on the utility feed for net metering