SOLAR PV

60 kW dairy farm solar PV system

This dairy farm solar PV single line diagram maps a 60 kWdc rooftop installation across two barn-facing array blocks. Both array outputs meet at a string combiner and DC isolator before a three-phase inverter feeds the 480Y/277 V farm main distribution. The same board supplies the operational loads and receives utility power through a bidirectional meter.

UPDATED 2026-09-23
TYPESld
USE-CASESolar Pv Sld
EXAMPLE60 kW dairy farm solar PV system
Make this diagram your own.

Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.

CASE ANALYSIS

Scenario

A dairy operator is adding roof-mounted PV to offset daytime milking and refrigeration demand at a three-phase service.

Key decisions

  • Two 30 kWdc arrays combine before the 1000 Vdc isolator.
  • A 50 kWac inverter converts the DC output for the 480Y/277 V board.
  • The PV feeder uses a 100 A, 25 kA breaker at the farm distribution.
  • The bidirectional meter sits between utility supply and the main board.

When to reuse this

This arrangement suits a modest agricultural facility with a single interconnected service. A final design needs utility export approval and a load study for motor starting demand.

FAQ

Frequently asked questions

Why use 480Y/277 V?01
It is a common three-phase service for commercial and agricultural motor and lighting loads.
What does the bidirectional meter record?02
It measures energy imported from and exported to the utility for billing and interconnection purposes.
Can the PV run during a utility outage?03
Not by itself; a grid-forming battery or approved backup system is needed for islanded operation.