CONSTRUCTION SAFETY

Excavation collapse barriers

This bowtie frames an excavation collapse as a barrier-management problem. Soil conditions and edge loading are shown as different threats, each with prevention measures that should be planned before workers enter the excavation. The right side recognises that rescue and medical response may be needed even when prevention fails. Use it to guide a pre-job discussion about the controls required on a specific site, the person responsible for checks and the conditions that should stop work. Add local ground conditions, weather, nearby services and regulations to make the diagram useful for the job. It does not replace a competent-person inspection, engineered protective system or legally required excavation plan.

UPDATED 2026-09-24
TYPEBowtie
EXAMPLEExcavation collapse barriers
Make this diagram your own.

Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.

CASE ANALYSIS

Scenario

Excavation planning review

Key decisions

  • Hazard: Keep worker exposure in view.
  • Top event: State the wall collapse.
  • Prevention: Include assessment, engineering and inspection.
  • Recovery: Plan rescue and medical response.

When to reuse this

Use in a pre-job safety discussion with site-specific competent-person requirements.

FAQ

Frequently asked questions

What is the top event?01
The excavation wall collapse is the central loss of control in this example.
Why include a rescue plan?02
Rescue is a recovery barrier that can reduce harm after a collapse.
Can weather be added?03
Yes. Rain or water ingress can be modelled as a threat or escalation factor.