התרחיש
A construction project team performs a routine safety site inspection and needs a repeatable workflow from planning through closure.
מה מופיע בתרשים הזה
פענחו את ההחלטות שמאחוריו.
01
Pre-inspection briefing completed?
02
PPE compliance observed?
Use for construction or industrial site safety walkthroughs where inspection steps, PPE enforcement, and hazard closeout must be documented and repeated.