Waterfall SDLC with Rework and Phase Delays

סוג תרשים זרימהתקן Sugiyama layered DAG + orthogonal routingמנוע schematex-flowchartעודכן 16.6.2026
Waterfall SDLC with Rework and Phase Delays
Drawing preview
התרחיש

A typical waterfall SDLC with sequential phases (requirements, design, development, testing, deployment, maintenance). The diagram includes approval gates after each phase and rework paths when issues are found during testing.

מה מופיע בתרשים הזה

פענחו את ההחלטות שמאחוריו.

01

Rework from Testing to Development for minor bugs

02

Rework from Testing to Design for major design flaws

03

Approval gates after Requirements, Design, Development, and Deployment

For software projects following a structured waterfall model where rework is anticipated during the verification phase.