ChatDiagram
Ladder · Manufacturing

Bottling Line Packaging Control

A bottling line sequence: conveyor runs when started and no jam is detected; a bottle-present sensor triggers a 3-second fill timer that opens the fill valve; after filling, a cap dispenser fires; any jam latches an alarm light requiring manual reset.

סוג לוגיקת סולםתקן IEC 61131-3 Ladder Diagramמנוע schematex-ladderעודכן 27.5.2026
Bottling Line Packaging Control
Drawing preview
התרחיש

A manufacturing engineer documenting a bottling-line PLC program for new operators needs a clean ladder diagram.

מה מופיע בתרשים הזה

פענחו את ההחלטות שמאחוריו.

01

ESTOP and JAM are XIO (normally-closed contacts) so conveyor stops immediately on either fault — fail-safe wiring.

02FILL_TIMER.EN triggers the valve, .DN closes it

valve is open for exactly the timer preset period.

03

Latching OTL on JAM_ALARM requires an explicit operator reset — prevents auto-restart after jams.

Add a label applicator rung and a bottle-count accumulator (CTU) for production tracking.

עיון בכל תבניות ה־לוגיקת סולם ←