Lo scenario
A food-grade beverage bottling facility needs a single-floor production layout connecting receiving, bottle storage, production hall, finished goods, and loading dock.
Cosa contiene questo disegno
Leggi le decisioni che ne stanno alla base.
01
Creation of one 24 m-wide production hall with internal keep-clear zones for unscrambler, filling, capping, labeling, and palletizing cells
02
Use of large sliding doors between finished goods and loading dock for efficient forklift and pallet movement
03
Assignment of pallet-rack grid and forklift location to distinguish storage from handling zones
Reuse for food or beverage production plants that need a linear process flow from raw material intake to finished goods dispatch, with clear separation of processing zones and warehouse storage.