La richiesta
“Create ladder logic with a start/stop sequence latch: run valve 1 for five seconds, then run valve 2 for three seconds after timer 1 is done.”
Prova alloraAdd a manual abort pushbutton.Change the timer preset to 30 seconds.
Cosa contiene questo disegno
Leggi le decisioni che ne stanno alla base.
01
Use of timers (TON) to control valve open durations.
02
Seal-in circuit to maintain sequence enable.
03
Cascading timer done bits to trigger subsequent steps.
When sequential operation of actuators is needed with defined on-times and manual start/stop control.