“Create an event tree for utility power loss at a data center with UPS support, generator start, and transfer-switch barriers, ending in continuous service, service interruption, or immediate outage.”
図の背後にある意思決定を読み解く。
The UPS bridges the interval before standby power is available.
Generator start is evaluated only if the UPS holds the load.
The switch must complete the connection to preserve service.
Use for a simple continuity discussion of one standby-power path; represent redundant paths separately when needed.
よくある質問
Why is the UPS the first barrier?
It provides immediate ride-through while the generator starts and the transfer switch operates.
Does this replace an availability model?
No. It is a clear consequence model that can inform, but does not replace, a detailed availability analysis.
Can an event tree show redundant generators?
Yes. Add the generator paths as ordered barrier functions that reflect the actual switching design.