상황
A construction team conducts a pre-handover inspection to verify site readiness before transferring the project to the client.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Site access confirmation
02
Major defects identified
03
All areas checked
04
Remedial work required
Reusable for any pre-handover, quality walkthrough, or snagging inspection in construction projects.