상황
A public school requires an ADA-compliant steel deck platform with a 1:12 access ramp connecting the main building to an elevated platform for inclusive outdoor activities.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Placed ramp along building edge to meet 1:12 slope
02
Positioned steel deck platform adjacent to ramp landing
03
Included parking and walkway connections for universal access
Use this layout for school accessibility upgrades, public building site plans, or steel deck and ramp installations where ADA slope and clearance are required.