상황
The launch PM shares this in weekly exec status. Overlapping bars show where workstreams parallelize (design polishing while engineering still builds) and the feature-freeze diamond makes the handoff between build and QA unmissable. The second milestone (public launch) anchors the entire timeline and is the reason every other bar exists.