Pump alternation logic FBD

This FBD separates pump selection into two readable networks. The first network drives pump 1 from a high-level demand and its availability signal. The second network provides a fallback for pump 2 by checking that pump 1 is not available. It is a useful starting point for a sump or lift-station control narrative, but a deployed program should also define motor protection, stop conditions, alarms, and the site-specific safety interlocks. Before using the layout in a build or document, compare every label with the source requirements and update the drawing when parts, conditions, or materials change. The example is deliberately small so the essential relationships remain readable, easy to review with collaborators, and ready to extend with the details required for the actual project.

UPDATED 2026-09-24
TYPEFbd
EXAMPLEPump alternation logic FBD
Make this diagram your own.

Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.

CASE ANALYSIS

Scenario

A sump controller needs a simple lead-and-fallback pump decision.

Key decisions

  • Demand: High level starts the selection.
  • Priority: Pump 1 is the preferred available pump.
  • Fallback: Pump 2 runs only when pump 1 is unavailable.

When to reuse this

Use as a simple selection pattern before adding interlocks, faults, and alternation memory.

FAQ

Frequently asked questions

What is an FBD network?01
It is a grouped set of function blocks that performs one part of the control logic.
Why is pump 1 negated for pump 2?02
The fallback runs only when the preferred pump is unavailable.
Does this alternate pumps?03
No. It selects a preferred pump; alternation needs additional state logic.
Open this example in the editor →

Tweak it with chat, export PNG/SVG, or fork it for your own use case.