ChatDiagram
scheduling · petri net · process modeling

Time-Constrained Scheduling with Place Invariants

類型 Petri 網標準 Murata 1989 + ISO/IEC 15909-1引擎 schematex-petri更新時間 2026/7/4
Time-Constrained Scheduling with Place Invariants
Drawing preview
情境

A manufacturing system schedules two types of jobs (A and B) using a shared pool of 3 machines. Each job type has a queue and processing time (A: exponential mean 1, B: mean 0.5 time units). Place invariants ensure the total number of machines is conserved.

這張圖裡有什麼

看懂背後的決策。

01

Model job queues as places with initial tokens

02

Use timed transitions for processing times

03

Enforce machine availability with shared resource place

This pattern generalizes to any resource-constrained scheduling with distinct job classes and stochastic processing times.

瀏覽所有 Petri 網 範本 →