“Create a production possibility curve for a bakery that can make up to 160 loaves of bread or 80 trays of pastries each morning, with a Saturday plan of 100 loaves and 35 pastry trays and an idle-time point of 70 loaves and 20 trays.”
看懂背後的決策。
Limit output by available bake time.
Reserve slots for both products.
Identify unused oven capacity.
Use when two product lines share a constrained resource.
常見問題
What constrains this bakery PPC?
Morning oven time, staff and preparation space constrain the two outputs.
Can the bakery produce beyond the frontier?
Not with its current capacity; it would need more resources or productivity.
Why are different mixes possible?
The bakery can allocate its shared capacity between bread and pastries.