“Draw a class project timeline with a research question, source finding, outline approval, report drafting, peer review, revision and class presentation.”
看懂背後的決策。
The topic is narrowed before research.
An approved outline guides the draft.
Peer review creates time for revision.
Use for a classroom assignment with a final written and spoken deliverable.
常見問題
What is a class project timeline?
It is a schedule that shows the stages and deadlines of a student assignment.
Why approve an outline?
It checks the research direction before students invest time drafting.
Should peer review be scheduled?
Yes. A planned review leaves enough time to revise before the final deadline.