الطلب
“Create a packaging-line controller flowchart: check safety interlocks, initialize the conveyor, wait for a product sensor, weigh the product, reject out-of-spec items, package accepted items, log each result, and stop when requested.”
جرّب إذنAdd a low-material alarm before packaging.Change the reject path to divert the product for rework.
ما الذي يتضمنه هذا الرسم
اقرأ القرارات الكامنة وراءه.
01
Using terminal-shaped Start and Stop nodes to mark clear entry/exit
02
Modeling safety interlock as a decision before motion
03
Routing reject and accept paths to a common stop-request check to avoid duplicate stop logic
Use for any cyclic machine control flowchart where an operator may request stop between items and safety must gate motion.