The request
“Create a commercial office fit-out workflow: define client requirements, design the space, revise until permits are approved, procure materials, construct, rectify failed inspections, complete a client walkthrough, and hand over the project.”
Then tryAdd a budget approval before procurement.Add a furniture installation step before the walkthrough.
What is in this drawing
Read the decisions behind it.
01
Permits Approval (loop back to redesign if rejected)
02
Quality Inspection (loop back to rectify issues)
When planning or analyzing a construction project's lifecycle from concept to closeout.
More like this