요청 내용
“Create a commercial office fit-out workflow: define client requirements, design the space, revise until permits are approved, procure materials, construct, rectify failed inspections, complete a client walkthrough, and hand over the project.”
그렇다면Add a budget approval before procurement.Add a furniture installation step before the walkthrough.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Permits Approval (loop back to redesign if rejected)
02
Quality Inspection (loop back to rectify issues)
When planning or analyzing a construction project's lifecycle from concept to closeout.