Scenario
An 18 MW biomass-fired extraction steam turbine generator supplies an 11 kV generator bus, steps up to 66 kV for utility interconnection, and feeds 400 V auxiliary loads including fans, pumps, and district energy equipment.
Key decisions
- Dedicated generator breaker isolates the STG while keeping the 11 kV bus energized
- Step-up transformer connects the 11 kV generator bus to the 66 kV utility grid
- Auxiliary transformer and 400 V bus supply house loads independent of the main generation path
- Utility interconnection meter provides export/import energy accounting
When to reuse this
Reusable for biomass, waste-to-energy, or combined heat and power plants with a prime-mover generator, utility interconnection, and auxiliary power distribution.
RELATED EXAMPLES
More cogeneration examples
Open this example in the editor →
Tweak it with chat, export PNG/SVG, or fork it for your own use case.
sld-18-mw-biomass-fired-extraction-stg-11-kv-district-energy-cog