The scenario
Industrial RO desalination plant requiring continuous operation with energy recovery to reduce power consumption and generator backup for reliability.
What is in this drawing
Read the decisions behind it.
01
VFDs on pumps for soft-start and speed control
02
Energy recovery booster motor to capture brine pressure
03
Automatic transfer switch (ATS) for seamless grid-to-generator transition
04
Power factor correction capacitor bank to manage inductive motor load
Applicable to medium-scale industrial water treatment facilities, particularly desalination plants with high motor loads and reliability requirements.
More like this