Lo scenario
Industrial RO desalination plant requiring continuous operation with energy recovery to reduce power consumption and generator backup for reliability.
Cosa contiene questo disegno
Leggi le decisioni che ne stanno alla base.
01
VFDs on pumps for soft-start and speed control
02
Energy recovery booster motor to capture brine pressure
03
Automatic transfer switch (ATS) for seamless grid-to-generator transition
04
Power factor correction capacitor bank to manage inductive motor load
Applicable to medium-scale industrial water treatment facilities, particularly desalination plants with high motor loads and reliability requirements.