Home renovation work breakdown structure.

A work breakdown structure divides a project into the pieces that can be planned, assigned and tracked. This renovation example starts with design decisions, then separates purchasing from site work. The numbered levels make it clear which work packages belong to each phase. It can be used as a starting point for a contractor, homeowner or project manager to agree on scope before scheduling work. Add owners, dates or costs in the project plan alongside the WBS; keep the diagram focused on the work itself.

Type OrganigrammeNorme Reingold-Tilford tidy treeMoteur schematex-orgchartMis à jour 24/09/2026
Home Renovation WBS
Drawing preview
La demande

“Create a work breakdown structure for a kitchen renovation: survey and design with room measurement and permits, procurement with cabinets and appliances, construction with demolition, electrical work and cabinet installation, then final inspection and closeout.”

Essayez ensuiteAdd plumbing work under construction.Add a budget review under procurement.
Ce que contient ce dessin

Comprenez les décisions qui le sous-tendent.

01Deliverable structure

Break the renovation into phases and work packages.

02Procurement timing

Order long-lead items before construction.

03Closeout

Include inspection before the project is complete.

Use this WBS to assign scope and track a small renovation.

Voir tous les modèles de organigramme →

FAQ

Questions fréquentes

What does a renovation WBS include?

It groups the project into phases and the work packages needed to complete each phase.

Why number a WBS?

Numbers show each item’s place in the hierarchy and make it easier to discuss scope.

Can I adapt this for another room?

Yes. Replace the work packages with the tasks and deliverables for that room.