Home renovation work breakdown structure.

A work breakdown structure divides a project into the pieces that can be planned, assigned and tracked. This renovation example starts with design decisions, then separates purchasing from site work. The numbered levels make it clear which work packages belong to each phase. It can be used as a starting point for a contractor, homeowner or project manager to agree on scope before scheduling work. Add owners, dates or costs in the project plan alongside the WBS; keep the diagram focused on the work itself.

유형 조직도표준 Reingold-Tilford tidy tree엔진 schematex-orgchart업데이트됨 2026. 9. 24.
Home Renovation WBS
Drawing preview
요청 내용

“Create a work breakdown structure for a kitchen renovation: survey and design with room measurement and permits, procurement with cabinets and appliances, construction with demolition, electrical work and cabinet installation, then final inspection and closeout.”

그렇다면Add plumbing work under construction.Add a budget review under procurement.
이 도면에 담긴 내용

그 이면의 의사결정을 읽어 보세요.

01Deliverable structure

Break the renovation into phases and work packages.

02Procurement timing

Order long-lead items before construction.

03Closeout

Include inspection before the project is complete.

Use this WBS to assign scope and track a small renovation.

모든 조직도 템플릿 보기 →

자주 묻는 질문

자주 묻는 질문

What does a renovation WBS include?

It groups the project into phases and the work packages needed to complete each phase.

Why number a WBS?

Numbers show each item’s place in the hierarchy and make it easier to discuss scope.

Can I adapt this for another room?

Yes. Replace the work packages with the tasks and deliverables for that room.