ChatDiagram
plc · process-control

CIP cleaning cycle SFC

A clean-in-place sequence is naturally expressed as an SFC because only one phase is active at a time. This example moves from idle through pre-rinse, timed caustic wash, and final rinse before issuing a completion pulse. Each transition names the signal that confirms the prior phase. It provides a compact design-review view of a cleaning cycle, while the actual recipe must still define temperatures, concentrations, flow, and validation requirements. Before using the layout in a build or document, compare every label with the source requirements and update the drawing when parts, conditions, or materials change. The example is deliberately small so the essential relationships remain readable, easy to review with collaborators, and ready to extend with the details required for the actual project.

種類 順序機能チャート規格 IEC 61131-3:2013 §6.5エンジン schematex-sfc更新日 2026/9/24
CIP cleaning cycle
Drawing preview
依頼内容

“Create an SFC for a CIP cleaning cycle with idle, pre-rinse, a 20-minute caustic wash, final rinse, and complete steps, advancing on the corresponding completion signals.”

次はこちらAdd a sanitize step after the final rinse.Change the caustic circulation time to 30 minutes.
この図に含まれるもの

図の背後にある意思決定を読み解く。

01Phases

Rinse, wash, and final rinse are separate active states.

02Timed action

Caustic circulation has a 20-minute delay qualifier.

03Completion

Each phase waits for its defined feedback.

Use as a high-level sequence; validated recipes and safety conditions remain site specific.

順序機能チャートのテンプレートをすべて見る →

よくある質問

よくある質問

What is CIP?

Clean-in-place is a controlled cleaning process for equipment without disassembly.

Why use a timed action?

It records that the wash action must remain active for a set time.

What returns the chart to idle?

The complete step transitions back to idle after its completion action.