20 MW utility-scale BESS substation

This utility-scale BESS single line diagram represents a 20 MW storage plant built from two equal battery and PCS blocks. Each 10 MWh DC block connects to a 10 MW power conversion system. Their 690 V outputs meet on a collection bus and are transformed to 34.5 kV for the grid point of interconnection.

유형 단선 결선도표준 IEEE Std 315 + ANSI device numbering엔진 schematex-sld업데이트됨 2026. 9. 22.
20 MW BESS substation
Drawing preview
요청 내용

“Draw a single-line diagram for a 20 MW utility BESS with two 10 MWh battery blocks, two 10 MW PCS units, a 690 V collection bus, 25 MVA 690 V to 34.5 kV transformer, intertie breaker, and 25/27/81 protection relay.”

그렇다면Add a third battery block.Add a revenue meter at the POI.
이 도면에 담긴 내용

그 이면의 의사결정을 읽어 보세요.

01

Each 10 MWh battery block has its own 10 MW PCS.

02

The PCS outputs combine on a 690 V bus before voltage transformation.

03

The 25 MVA GSU provides capacity above the 20 MW nominal conversion rating.

04

An intertie breaker and 25/27/81 relay protect the 34.5 kV point of interconnection.

This pattern suits a modular utility-scale BESS with a collector-system interconnection. The final project requires detailed relay coordination, grounding, and utility telemetry design.

모든 단선 결선도 템플릿 보기 →

자주 묻는 질문

자주 묻는 질문

Why are PCS blocks modular?

Modular PCS blocks simplify procurement, maintenance, and staged expansion.

What is a GSU transformer?

A generator step-up transformer raises low-voltage PCS output to the medium-voltage interconnection level.

What do 25/27/81 mean?

They are ANSI device numbers for synchronism check, undervoltage, and frequency protection functions.