ChatDiagram
aviation · electrical · circuit diagram

HOBBS Meter Enable Circuit

類型 電路圖標準 IEEE Std 315 / ANSI Y32.2引擎 schematex-circuit更新時間 2026/9/16
HOBBS Meter Enable Circuit
Drawing preview
情境

A Lycoming O-360 installation needs the HOBBS hour meter to run only when oil pressure is present and after a 5-second start delay to avoid recording engine start cranking.

這張圖裡有什麼

看懂背後的決策。

01

Power feeds through a 1 A breaker to protect the HOBBS meter circuit.

02

An oil pressure switch enables the relay coil, so the meter only runs with engine oil pressure.

03

A 5 s time delay relay prevents the HOBBS meter from logging the start sequence.

Use when wiring a HOBBS meter in small aircraft with battery, oil pressure switch, breaker, and start delay.

瀏覽所有 電路圖 範本 →