ELECTRICAL ENGINEERING
5.2 MW Gas Turbine CHP — 4.16 kV University Campus Cogeneration Plant SLD
A worked electrical engineering example, rendered live. Open it in the AI editor and adapt it to your own case.
Make this diagram your own.
Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.
CASE ANALYSIS
Scenario
A university campus operates a 5.2 MW gas turbine generator at 4.16 kV in parallel with the utility, feeding campus chillers and auxiliary loads through a step-down transformer.
Key decisions
- Parallel utility and gas turbine generator on the main 4.16 kV bus
- Dedicated metering at utility and generator interconnection points
- Transformer-fed 480V bus for chiller motors and auxiliary load separation
When to reuse this
Use for campus or institutional cogeneration single-line diagrams with medium-voltage distribution, generator paralleling, and motor loads.
Open this example in the editor →
Tweak it with chat, export PNG/SVG, or fork it for your own use case.