5.2 MW Gas Turbine CHP — 4.16 kV University Campus Cogeneration Plant SLD

A worked electrical engineering example, rendered live. Open it in the AI editor and adapt it to your own case.

UPDATED 2026-09-27
EXAMPLE5.2 MW Gas Turbine CHP — 4.16 kV University Campus Cogeneration Plant SLD
Make this diagram your own.

Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.

CASE ANALYSIS

Scenario

A university campus operates a 5.2 MW gas turbine generator at 4.16 kV in parallel with the utility, feeding campus chillers and auxiliary loads through a step-down transformer.

Key decisions

  • Parallel utility and gas turbine generator on the main 4.16 kV bus
  • Dedicated metering at utility and generator interconnection points
  • Transformer-fed 480V bus for chiller motors and auxiliary load separation

When to reuse this

Use for campus or institutional cogeneration single-line diagrams with medium-voltage distribution, generator paralleling, and motor loads.

Open this example in the editor →