상황
A university campus operates a 5.2 MW gas turbine generator at 4.16 kV in parallel with the utility, feeding campus chillers and auxiliary loads through a step-down transformer.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Parallel utility and gas turbine generator on the main 4.16 kV bus
02
Dedicated metering at utility and generator interconnection points
03
Transformer-fed 480V bus for chiller motors and auxiliary load separation
Use for campus or institutional cogeneration single-line diagrams with medium-voltage distribution, generator paralleling, and motor loads.