Le scénario
A university campus operates a 5.2 MW gas turbine generator at 4.16 kV in parallel with the utility, feeding campus chillers and auxiliary loads through a step-down transformer.
Ce que contient ce dessin
Comprenez les décisions qui le sous-tendent.
01
Parallel utility and gas turbine generator on the main 4.16 kV bus
02
Dedicated metering at utility and generator interconnection points
03
Transformer-fed 480V bus for chiller motors and auxiliary load separation
Use for campus or institutional cogeneration single-line diagrams with medium-voltage distribution, generator paralleling, and motor loads.