Construction site risk matrix.
A construction risk matrix gives a team one view of the hazards present on a site. Place each hazard by the likelihood that it will occur and the severity of the possible harm. The point is to guide controls, not to replace a task-specific assessment. Use terms that describe actual work, such as temporary power or scaffolding, so the crew can connect each dot with the right precautions. Discuss the scores with people who know the work, then record the controls, owner, and review point outside the chart. Update the matrix as trades, equipment, weather, crews, or site controls change.
Open it in the AI editor with a prompt pre-filled — keep what works, change what doesn't.
Scenario
A site supervisor is preparing a safety briefing and control plan.
Key decisions
- Name hazards: Use specific site activities and events.
- Estimate exposure: Place hazards using agreed likelihood and severity scales.
- Plan controls: Record controls for the risks that need immediate treatment.
When to reuse this
Use this at planning meetings and refresh it when the site work changes.
Frequently asked questions
What does a construction risk matrix show?
Who should contribute to it?
When should it be updated?
More construction examples
Try the diagram makers.
Tweak it with chat, export PNG/SVG, or fork it for your own use case.