Construction site risk matrix.

A construction risk matrix gives a team one view of the hazards present on a site. Place each hazard by the likelihood that it will occur and the severity of the possible harm. The point is to guide controls, not to replace a task-specific assessment. Use terms that describe actual work, such as temporary power or scaffolding, so the crew can connect each dot with the right precautions. Discuss the scores with people who know the work, then record the controls, owner, and review point outside the chart. Update the matrix as trades, equipment, weather, crews, or site controls change.

Tipo MatriceStandard 2×2 / N×M quadrant conventionMotore schematex-matrixAggiornato 24/09/2026
Construction Site Risk Matrix
Drawing preview
La richiesta

“A construction site risk matrix with harm severity on the horizontal axis and likelihood on the vertical axis. Plot falls from scaffolds, plant vehicle strikes, manual handling strain, dropped tools, temporary power shock, and slips on wet surfaces.”

Prova alloraAdd excavation collapse as a severe risk.Move temporary power shock to more likely.
Cosa contiene questo disegno

Leggi le decisioni che ne stanno alla base.

01Name hazards

Use specific site activities and events.

02Estimate exposure

Place hazards using agreed likelihood and severity scales.

03Plan controls

Record controls for the risks that need immediate treatment.

Use this at planning meetings and refresh it when the site work changes.

Sfoglia tutti i modelli di tipo matrice →

FAQ

Domande frequenti

What does a construction risk matrix show?

It compares site hazards by likelihood and potential harm.

Who should contribute to it?

Supervisors, workers, and safety specialists who understand the site work.

When should it be updated?

Update it when the work scope, conditions, or controls materially change.