“A construction site risk matrix with harm severity on the horizontal axis and likelihood on the vertical axis. Plot falls from scaffolds, plant vehicle strikes, manual handling strain, dropped tools, temporary power shock, and slips on wet surfaces.”
図の背後にある意思決定を読み解く。
Use specific site activities and events.
Place hazards using agreed likelihood and severity scales.
Record controls for the risks that need immediate treatment.
Use this at planning meetings and refresh it when the site work changes.
よくある質問
What does a construction risk matrix show?
It compares site hazards by likelihood and potential harm.
Who should contribute to it?
Supervisors, workers, and safety specialists who understand the site work.
When should it be updated?
Update it when the work scope, conditions, or controls materially change.