ChatDiagram
Single Line Diagram · Sld

Data center 2N UPS single-line — Single Line Diagram

This data center 2N UPS single-line diagram shows two independent power paths from 13.8 kV utilities to a critical IT load. Utility A feeds TX-A, Switchgear A, UPS A, and PDU A. Utility B follows the parallel path through TX-B, Switchgear B, UPS B, and PDU B. Each transformer is rated 2500 kVA and steps down to 480 V; each UPS is rated 1 MW. The two PDU outputs enter a 1600 A static transfer switch, which supplies the critical load.

Type Single-line diagramStandard IEEE Std 315 + ANSI device numberingEngine schematex-sldUpdated 9/24/2026
Data center 2N UPS single-line
Drawing preview
The request

“Draw a 2N data center UPS single-line with two 13.8 kV utilities, 2500 kVA 13.8 kV/480 V transformers, separate 480 V switchgear and 1 MW UPS paths feeding PDU A and PDU B, then a 1600 A static transfer switch and critical IT load.”

Then tryAdd a protected feeder from PDU A.Change both UPS ratings to 1.5 MW.
What is in this drawing

Read the decisions behind it.

01Independent sources

Utility A and Utility B each feed a separate transformer, switchgear bus, and UPS.

02Matched transformation

Both transformers step 13.8 kV down to 480 V and are rated 2500 kVA.

03Separate distribution

UPS A feeds PDU A and UPS B feeds PDU B before the paths meet.

04Selected critical feed

The 1600 A static transfer switch selects between the two PDU inputs for the critical IT load.

Use this one-line to explain a dual-path UPS topology with a static-transfer-fed load. Confirm capacity, maintenance bypasses, protection coordination, and the actual IT distribution design with the project engineer.

More like this

Other examples in this family.

Browse all single‑line diagram templates →

FAQ

Common questions

What does 2N mean in this UPS diagram?

It denotes two independent power paths, each capable of supporting the intended critical-load requirement when properly sized.

Why do the PDU paths meet at a static transfer switch?

The static transfer switch selects one PDU source for the depicted critical load rather than paralleling the two sources.

Are the two 1 MW UPS units automatically sufficient?

No. Their capacity must be checked against the critical load, power factor, redundancy target, battery runtime, and future growth.

Is this a switching procedure?

No. It is a one-line topology. Site-specific operating procedures require approved protection and commissioning information.