G99/G100 Compliant Solar + Battery with Demand Response
Drawing preview
The scenario

Design a single-line diagram for a residential/commercial solar-plus-storage system under UK G99/G100 grid codes, featuring an SMA Sunny Tripower 15kW inverter, battery storage, and demand response capability.

What is in this drawing

Read the decisions behind it.

01

Used IEC graphical symbols for a 3-phase 400V system.

02

Placed a G100 export limitation relay between the meter and the main busbar to curtail export when required.

03

Added a controlled demand response load to absorb excess generation.

04

Modeled the PV and battery inverters as separate sources with individual circuit breakers.

When designing or documenting a grid-connected solar and battery system that must comply with UK Engineering Recommendation G99 (generation connection) and G100 (export limitation), especially with demand response integration.