Lo scenario

Design a single-line diagram for a residential/commercial solar-plus-storage system under UK G99/G100 grid codes, featuring an SMA Sunny Tripower 15kW inverter, battery storage, and demand response capability.

Cosa contiene questo disegno

Leggi le decisioni che ne stanno alla base.

01

Used IEC graphical symbols for a 3-phase 400V system.

02

Placed a G100 export limitation relay between the meter and the main busbar to curtail export when required.

03

Added a controlled demand response load to absorb excess generation.

04

Modeled the PV and battery inverters as separate sources with individual circuit breakers.