Le scénario
The diagram documents the SEA-ME-WE 5 subsea cable system, focusing on three landing stations in Marseille, Egypt, and Mumbai, each with local partner switch handoffs.
Ce que contient ce dessin
Comprenez les décisions qui le sous-tendent.
01
Modeled each landing station as a site boundary with a core router and partner switch.
02
Used fiber links for the submarine cable segments between landing stations.
03
Selected a bus layout to reflect the linear physical path of the cable.
Use this template when documenting submarine cable landing station interconnections and local partner switch topology.