התרחיש
The diagram documents the SEA-ME-WE 5 subsea cable system, focusing on three landing stations in Marseille, Egypt, and Mumbai, each with local partner switch handoffs.
מה מופיע בתרשים הזה
פענחו את ההחלטות שמאחוריו.
01
Modeled each landing station as a site boundary with a core router and partner switch.
02
Used fiber links for the submarine cable segments between landing stations.
03
Selected a bus layout to reflect the linear physical path of the cable.
Use this template when documenting submarine cable landing station interconnections and local partner switch topology.