상황
The diagram documents the SEA-ME-WE 5 subsea cable system, focusing on three landing stations in Marseille, Egypt, and Mumbai, each with local partner switch handoffs.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Modeled each landing station as a site boundary with a core router and partner switch.
02
Used fiber links for the submarine cable segments between landing stations.
03
Selected a bus layout to reflect the linear physical path of the cable.
Use this template when documenting submarine cable landing station interconnections and local partner switch topology.