Cafe opening activity-on-arrow diagram

This activity-on-arrow diagram maps the preparation needed to open a cafe. The initial concept and menu approval establish the decisions that release equipment ordering, staff training and counter setup. Those activities run in parallel, but the opening event cannot happen until every one is finished. The model keeps the opening date connected to the operational work that makes it possible. It works well for a small hospitality launch, pop-up or concession. Adapt the names and durations for permits, supplier lead times, menu testing and the staffing plan that applies to your opening.

סוג PERT / גאנטתקן PMI PMBOK 7 + Moder 1983 (AON/PDM)מנוע schematex-pertעודכן 24.9.2026
Cafe opening (AOA)
Drawing preview
הבקשה

“Create an activity-on-arrow diagram for a cafe opening: confirm the concept, approve the menu, order equipment, train staff, set up the counter, then open the cafe.”

ואז נסוAdd a food-safety inspection before opening.Change staff training to take six days.
מה מופיע בתרשים הזה

פענחו את ההחלטות שמאחוריו.

01Menu approval

Equipment, staff and counter preparation follow the approved menu.

02Parallel preparation

These three activities can proceed together.

03Opening event

The cafe opens only after every preparation activity finishes.

Use it for a small opening plan with one approval gate and several required readiness activities.

עיון בכל תבניות ה־PERT / גאנט ←

שאלות נפוצות

שאלות נפוצות

What does the opening depend on?

Equipment, staff training and counter setup must all be complete.

Can permits be added?

Yes, add a permit activity and make opening depend on it.

Why use AOA here?

It makes the approval and opening events clear while placing work on the arrows.