Design review for a 1 MW utility-scale solar PV plant requiring a three-phase step-up transformer and utility interconnection at 12.47 kV.

この図に含まれるもの

図の背後にある意思決定を読み解く。

01

Use transformer_dy for 480V to 12.47kV step-up with delta-wye isolation

02

Place revenue meter on MV side ahead of utility point of connection

03

Use switch_load for DC disconnect per NEC 690 isolation

04

Represent grid-tie inverter as generic load symbol pending dedicated static converter symbol

Reuse when drafting utility interconnection SLDs for behind-the-meter or export PV systems with transformer isolation and MV metering.