Design review for a 1 MW utility-scale solar PV plant requiring a three-phase step-up transformer and utility interconnection at 12.47 kV.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Use transformer_dy for 480V to 12.47kV step-up with delta-wye isolation
02
Place revenue meter on MV side ahead of utility point of connection
03
Use switch_load for DC disconnect per NEC 690 isolation
04
Represent grid-tie inverter as generic load symbol pending dedicated static converter symbol
Reuse when drafting utility interconnection SLDs for behind-the-meter or export PV systems with transformer isolation and MV metering.